Epics & Stories
57 stories across 12 epics, organized by phase. Sprints run April-June 2026.
Overview
| Epic | Phase | Stories | Status |
|---|---|---|---|
| E1: CLAUDE.md Configuration | 1 | 5 | Done |
| E2: Agent Fleet | 1 | 6 | Done |
| E3: Skill Library | 1 | 5 | Done |
| E4: MCP Ecosystem | 1 | 5 | Done |
| E5: Hook Automation | 1 | 4 | Done |
| E6: Rules & Memory | 1 | 4 | Done |
| E7: Team Configuration | 2 | 5 | Planned |
| E8: Hogwarts Pilot | 2 | 5 | In Progress |
| E9: Agent Teams & CI/CD | 2 | 4 | Planned |
| E10: Revenue & Operations | 2 | 5 | Planned |
| E11: Agent SDK Platform | 3 | 4 | Future |
| E12: Enterprise & Optimization | 3 | 3 | Future |
Phase 1: Developer Engine (Done)
E1: CLAUDE.md Configuration
- User-level CLAUDE.md (stack, mode, preferences)
- Project-level CLAUDE.md (context, architecture)
- Repo-level CLAUDE.md (100+ keywords, workflows)
- Keyword system (dev, build, deploy, saas, test...)
- Configuration hierarchy validation
E2: Agent Fleet
- Stack chain (7): nextjs, react, typescript, tailwind, prisma, shadcn, authjs
- Design chain (4): orchestration, architecture, pattern, structure
- UI chain (4): shadcn, atom, template, block
- DevOps chain (3): build, deploy, test
- VCS chain (2): git, github
- Specialized (8): middleware, i18n, semantic, sse, optimize, performance, comment, icon
E3: Skill Library
- Workflow: /dev, /build, /quick, /deploy
- Creation: /atom, /template, /block, /saas
- Quality: /test, /security, /performance, /fix
- Documentation: /docs, /codebase, /repos
- QA: /handover (5-pass across 2 environments)
E4: MCP Ecosystem
- UI & Design: shadcn, figma, tailwind, a11y, storybook
- Testing: browser (headless), browser-headed
- DevOps: github, vercel, sentry, gcloud
- Data: neon, postgres, stripe, keychain
- Knowledge: ref, context7, linear
E5: Hook Automation
- Auto-format (Prettier on Write/Edit)
- Port management (kill 3000 before dev)
- Browser launch (Chrome after dev)
- Session logging (timestamps)
E6: Rules & Memory
- 8 path-scoped rules (auth, i18n, prisma, tailwind, testing, deployment, multi-repo, org-refs)
- Preference memory (port, env, pnpm)
- Component memory (59 atoms, 31 templates, 4 blocks)
- Repository memory (14 repos)
Phase 2: Team Engine (Current)
E7: Team Configuration
| Story | Owner | Priority |
|---|---|---|
| Shared settings.json via git | Abdout | P0 |
| Role-based installer (engineer/business/content) | Abdout | P0 |
| Windows setup guide + PowerShell installer | Sedon | P1 |
| Onboarding documentation for all roles | Samia | P1 |
| Local override support (.local.json) | Abdout | P0 |
E8: Hogwarts Pilot (King Fahad Schools)
| Story | Owner | Priority |
|---|---|---|
| Admission block — 5-pass QA clean | Abdout | P0 |
| Notification system — SMS + in-app for parents | Abdout | P0 |
| Messaging — school-parent communication | Abdout | P1 |
| Arabic content + user guide | Samia | P0 |
| Client onboarding plan + training materials | Ali | P0 |
E9: Agent Teams & CI/CD
| Story | Owner | Priority |
|---|---|---|
| Agent Teams parallel feature build | Abdout | P0 |
| GitHub Actions PR review (Agent SDK) | Abdout | P0 |
| Scheduled cloud tasks (health, deps) | Abdout | P1 |
| Pattern compliance CI check | Abdout | P1 |
E10: Revenue & Operations
| Story | Owner | Priority |
|---|---|---|
| Stripe billing integration for Hogwarts | Abdout | P0 |
| Client outreach templates (Arabic) | Ali | P0 |
| Financial tracking dashboard (Cowork + Stripe MCP) | Ali | P1 |
| Arabic marketing content for ed.databayt.org | Samia | P1 |
| Competitive analysis: school platforms in Sudan | Samia | P2 |
Phase 3: Company Engine (Future)
E11: Agent SDK Platform
- CI/CD review agent (auto-review every PR)
- Deploy verification agent (post-deploy health)
- School onboarding agent (automated tenant setup)
- Client report agent (weekly status generation)
E12: Enterprise & Optimization
- SSO/SCIM + audit logging
- Prompt caching + batch API (95% cost savings)
- Pattern distribution packaging
Sprint Plan (April-June 2026)
| Sprint | Dates | Focus | Key Deliverables |
|---|---|---|---|
| S1 | Apr 1-14 | Foundation | Installer scripts, role configs, fumadocs site |
| S2 | Apr 15-28 | Hogwarts QA | Admission 5-pass, notification system |
| S3 | May 1-14 | Team + Revenue | Cowork onboarding (Ali, Samia), Stripe billing |
| S4 | May 15-28 | Automation | Agent Teams, CI/CD, scheduled tasks |
| S5 | Jun 1-14 | Pilot Launch | King Fahad Schools go-live, monitoring |
Sprint 1 Detail (Current)
| Task | Owner | Status |
|---|---|---|
| Refactor docs to Databayt context | Abdout | Done |
| Update fumadocs MDX site | Abdout | In Progress |
| Create role-based installer | Abdout | Planned |
| Update repositories.json (11 → 14 repos) | Abdout | Planned |
| Windows PowerShell installer | Sedon | Planned |
On This Page
Epics & StoriesOverviewPhase 1: Developer Engine (Done)E1: CLAUDE.md ConfigurationE2: Agent FleetE3: Skill LibraryE4: MCP EcosystemE5: Hook AutomationE6: Rules & MemoryPhase 2: Team Engine (Current)E7: Team ConfigurationE8: Hogwarts Pilot (King Fahad Schools)E9: Agent Teams & CI/CDE10: Revenue & OperationsPhase 3: Company Engine (Future)E11: Agent SDK PlatformE12: Enterprise & OptimizationSprint Plan (April-June 2026)Sprint 1 Detail (Current)